What we have done

...Pictures of Launch Day

Major existing now working equipment includes: HF Ham Radio, VHF, Propane Heater, Radar, 2 solar panels; main, furling genoa, storm trysail, jib; storm jib; drifter; propane stove, 20 yr old diesel engine;

Existing but not yet working: Propane Hot Water, Autopilot, Watermaker, Refrigerator.

Replacements include: older Aries windvane (replaced); outboard for dinghy (replaced);

Deferred Maintenance

  • Engine
    • Extensive engine work - rewiring; heat exchanger cored, general maintenance
    • Replaced gear shift and throttle linkage to engine
  • Plumbing
    • replaced all gross filthy water tubing with new runs.
    • Water tanks - cleaned, repaired coated steel integral tanks; replaced inspection port gaskets
    • Cleaned and repaired shower drainage and all pumps in bilges.
    • Replace broken hand pump with foot pump in head sink
  • Hull and Deck
    • Structure - replaced corroded steel hull/wood deck edge flanges with new steel and wider flanges - transom, port chainplate, bow;
    • Replaced port rub rail
    • Stripped rubber coating off cockpit seats - varnished and painted. Painted aluminum footwell of cockpit; re powder-coated binnacle
    • Rebedded all deck hardware;
    • Replace zincs, bottom paint
    • Repainted decks, topsides, cabintop with epoxy primer and polyeurathane paint; applied non-skid to decks and cabintop
  • Rigging
    • Aluminum mast - re-bedded all attachments, replaced some bent blocks with larger parts, replaced worn sheaves, replaced masthead lights with LEDs, checked wiring
  • Interior
    • Floor beams - beefed up floor beams in cabin; added hold-downs and lift tabs
    • Removed and cleaned all ceiling and locker floor boards - painted, varnished, or replaced.
    • Revarnished interior mahogany - table, shelving, ceiling boards, etc.
  • Re-galvanized anchors; added storm anchor

Updates / Modifications

  • Electronics / Navigation
    • Updated the GPS; removed Loran C. Replaced depth sounder. Added second GPS; added handheld GPS; added mouse GPS to computer
    • Added Sextant, hand-bearing compass and good binos from previous boat
    • Acquired used Paper charts of Pacific
    • Added PC Nav system (older laptop and Rosepoint Coastal Explorer) and downloaded all electronic charts for west coast and Hawaii
    • Added Pactor modem and got our General Ham Licenses;
    • added AIS and antenna splitter
    • Replace depth sounder, add fish finder (got it cheap!)
  • Canvas / Fabric
    • Replaced cockpit line bags and storage sacks.
    • Made new sail cover and boat cover. Restitched older awning.
    • Corroded metal zipper pulls replaced with plastic pulls on existing cockpit cushions
    • Made sturdy canvas bags for provisioning; made tool bags and wrench-rolls; made equipment covers for barbeque, outboard, water filter, etc.
    • Made sail deck bag for staysail
    • Re-canvassed existing dodger frame
    • Made weather cloths for cockpit rails
    • Made polarfleece curtains, installed curtain rods
    • Made chaps for inflatable
  • Engine
    • Summer 2009 - completely rebuilt engine; replaced block
  • Hull / Decks
    • Replaced inadequate venting in lazarette with larger vents
    • Strengthened beams inside port side of cabin lockers/pilot berth- excessive working was causing leaks under deck near chainplate;
    • Replaced child-sized port pilot berth with four lockers and louvered doors - also helped stiffen hull near port chainplates.
    • Repaired (cold-molded) entire front of exterior cabin where it was separating from deck. Strengthened beam here.
    • Replaced lexan companionway panels with stouter mahogany panels
    • Fabricated new stainless railings around cockpit to replace aging aluminum one; added stainless boarding ladder
    • Added MOB pole; jacklines, harnesses
    • Replaced aging aluminum radar spar with used stainless spar
    • Added permanent boom crutch over dodger; bought used teak crutch with aluminum base and then powder-coated the base, recut the crutch for our round boom, and lined with high-density plastic liners; varnished crutch.
    • Cut out bad steel and welded in new metal at stern, port chainplate, bow as well as engine exhaust; added stouter steel beams and flanges; redecked in these areas.
    • Cut larger cockpit drains
    • Painted topsides, deck, cabin top with 2-part epoxy (roll / brush)
    • Applied nonskid (Kiwi Grip) on decks and cabintop
    • Replaced stern cleats, chocks, and bow cleats with larger ones bolted through new steel flange.
    • Fixed and built new mount for bilge pump
    • Insulate hull (ensolite outboard and reflectix inboard)
    • Added 44# Bruce anchor, 75# Fisherman and additional rodes.
  • Interior
    • Added cabin sole hold-downs (interior)
    • Summer 2009 - replaced galley stove with newer unit
  • Electrical
    • Redesigned and fortified battery storage box; replaced battery cables; replaced batteries;
    • Added dedicated starting battery
    • added small inverter;
    • Added CD stereo with USB/iPod input; added wooden box to house stereo
    • Rewired obvious aging wiring, replaced some terminal ends, updated electrical wiring charts to spreadsheet
  • Plumbing
    • Added head holding tank to be legal in US
    • Fixed bilge pumps - manual and automatic
  • Rigging / Sails
    • Added Preventers, new blocks, new running rigging
    • Added used sails: nylon drifter, furling genoa; stays'ls; storm jib
    • Replace Windvane with newer Aries Windvane (old one will be sold or used for spares)
  • Tenders
    • Added hard sailing dinghy (nesting) and (used) hypalon inflatable; also (used) outboard for inflatable
    • Painted hard (nesting) sailing dinghy; rebuilt tiller
    • Fabricated mounting system for hard dinghy on cabintop beneath boom

Luxuries

  • Replaced (4) non-opening, scarred lexan ports with new opening bronze ports
  • Made all new cabin cushions; added hypervent under all bunks; added back cushions for settee; new bedding (sheets, polypro blankets, pillows)
  • Got used diving tanks and regulator
  • Replaced some interior cabin lights with LEDs
  • New propane Barbeque and small-bottle propane storage bin on rear deck
  • Equipped galley - pressure cooker, tools, utensils, plates, knives, magma nesting cooking set, french press, thermoses, food storage containers, vacuum sealer; collapsible bucket for second sink; spice rack for 30 spices
  • Recorded many hours of CDs onto hard disc in MP3 format; copied to thumb drives
  • Replaced VHF with DSC capable VHF
  • Improved removable nav seat (folding hard plastic chair on swivel mount)

To do (someday)

  • Install new (used) bimini
  • New headsails
  • Fix watermaker, refrigerator, water heater, autopilot
  • Add deck wash down (bought not installed)
  • Add propane solenoid
  • Replace aging awning
  • Replace standing rigging
  • Replace single shallow sink with double sink
  • Figure out WeatherFax and dedicated ICOM 1000 receiver (never used)
  • Re-secure wiring inside mast
  • re-bed all opening ports
  • Insulate mast inside cabin
  • Replace propane heater with diesel heater
  • Polish fuel/ clean fuel tanks